Bulkheads near completion
All of the corner tabs are in and the control pushrod guides are cut. Final positioning and installation of the pushrod guides will be done after the bulkheads are on the beam and the hole alignment is confirmed. Vertical center lines and horizontal positioning lines need to added to the bulkheads with a final inspection before going to the beam.
Also, the hand riveter head fits the air riveter which will make the next 3900 rivets a lot easier to pull!