Thursday, August 9, 2007

E2 Installation

Build hours: 97
After the E-D skin had been fitted and the E-F skin had been fitted and trimmed to the F bulkhead, the E-F skin was removed and a line was drawn 7 11/32" in from the F bulkhead edge. The beam was cut behind E and turned over. Bulkhead E2 was predrilled and then each tab was backdrilled after aligning the line in the tab hole. Tabs on alternate sides of the bulkhead were done until about 3/4's of the tabs were done. Then, one side was left open while the remaining tabs were completed to the center of the bulkhead.



No comments:

Post a Comment