Engine compartment
Build hours: 218
Job and scheduling interfered with the important things of life but we are back and moving on the engine compartment. The side braces were added to both UCs.
A joggle was added at the upper end to stop the skin from being pulled in at the firewall. Job and scheduling interfered with the important things of life but we are back and moving on the engine compartment. The side braces were added to both UCs.
The cowls were formed and mounted along with the lower firewall braces and the the lower engine baffle. The lower baffle and the firewall braces were put under the skin to create a cleaner look around the engine compartment. The oil cooler baffle has been formed but will go in after the engine is fitted.
No comments:
Post a Comment