Monday, November 16, 2009

Wing Construction

Build Hours: 1080 (we're sloooooow)

Support the ribs while skinning.


Use the vacuum method to preform the nose skins.


Wrap fit and trim










The shop is maxed out!

A worm gear drive winch allows the planes to be swapped as needed or this is the beginning of The World's Smallest Airplane Museum.

No comments:

Post a Comment