Monday, November 16, 2009
Wing Construction
Build Hours: 1080 (we're sloooooow)
Support the ribs while skinning.
Use the vacuum method to preform the nose skins.
A worm gear drive winch allows the planes to be swapped as needed or this is the beginning of The World's Smallest Airplane Museum.
Posted by Charles S at 7:00 PM 0 comments
Labels: wings
Subscribe to:
Posts (Atom)