Bottom rails, vertical stab
Build hours: 262
The bottom rails were drilled, deburred and riveted to the fuselage bottom. The area around the spar was left open until the actual spar bolt locations were drilled.
This blog was created to chronicle the building of two Hummel Ultracruiser ultralights.
Posted by
Charles S
at
7:10 AM
No comments:
Post a Comment