Elevator hardware
Build hours: 333
Rough skins for the remaining elevators were cut and flat 4130 parts for the elevator and rudder control horns were cut.
This blog was created to chronicle the building of two Hummel Ultracruiser ultralights.
Posted by
Charles S
at
9:41 PM
0
comments
Labels: elevators
Posted by
Charles S
at
9:19 PM
0
comments
A piece of .062 lexan was used for the 2.5" inspection holes. 6-32 nutplates were riveted to the lexan to secure the inspection plate. By removing 3 screws and loosening the fourth, the inspection plate can be rotated for access to the stab bolts. The lexan covers were installed before closing but could have been rolled and inserted through the hole at a later time.
Posted by
Charles S
at
2:09 PM
0
comments
Labels: horizontal stab